The four handover stages, in plain words
Office space in India is handed over at one of four broad stages. The names are used loosely, so treat them as a starting vocabulary, not a standard.
- Bare shell. The building is complete and approved, with its structure, facade, lifts, stairs, common washrooms and a power supply to the floor. Inside your area there is little more than a concrete floor, walls and columns. The law firm Ikigai Law described a bare shell in a 2020 guide as having no interior furnishing, air conditioning, lighting or plumbing.
- Warm shell. A bare shell with the main building services installed in your area. A Bengaluru developer, Brigade Group, describes warm shell as having finished flooring, air conditioning, basic electrical work, plumbing and lighting, sometimes with ceiling panels. What it still needs is the tenant's own layout: partitions, cabins, workstations and IT.
- Fitted (or fitted-out). The interiors are built to a layout: cabins, meeting rooms, pantry, workstations, cabling. Furniture may or may not be included.
- Plug and play, fully furnished or managed. Everything is ready, including furniture, internet and often housekeeping. You bring laptops and start. When an operator also runs the space for you, it is a managed office.
A fifth term you will hear is built to suit: the owner designs and builds a building, or a floor, to one tenant's brief, usually in return for a long lease.
Not everyone draws the lines in the same place. A brokerage, Address Advisors, simply calls warm shell a middle ground with some finishes already in place. Because each developer draws the line between bare and warm shell a little differently, the one rule that protects both sides is simple: attach a written specification to the term sheet, item by item.
What is usually included at each stage
This is the typical pattern in Indian office buildings. Individual buildings vary, which is exactly why the checklist further down matters.
| Item | Bare shell | Warm shell | Fitted | Plug and play / managed |
|---|---|---|---|---|
| Structure, facade, lifts, common areas | Yes | Yes | Yes | Yes |
| Common washrooms and fire staircases | Yes | Yes | Yes | Yes |
| Power supply up to the floor | Yes | Yes | Yes | Yes |
| Generator backup | Often common areas only | Often extended to your area, check the share | Yes | Yes |
| Air conditioning in your area | No | Usually installed | Yes, adjusted to layout | Yes |
| Fire detection and sprinklers in your area | Building system, may need extending | Usually in place | Adjusted to layout | Yes |
| Finished flooring | No, bare concrete | Usually | Yes | Yes |
| False ceiling and lighting | No | Lighting usually, ceiling sometimes | Yes | Yes |
| Partitions, cabins, meeting rooms | No | No | Yes | Yes |
| Workstations and chairs | No | No | Sometimes | Yes |
| Data cabling, Wi-Fi, internet | No | No | Cabling usually | Yes |
| Pantry and in-office washrooms | No | Plumbing points sometimes | Yes | Yes |
| Housekeeping, front desk, security staff | No | No | No | Often, in a managed office |
Who pays for what
The stage of handover decides how the money splits between owner and tenant. These are the common arrangements; every one of them is negotiable.
Bare shell
- Owner pays: the building, its approvals, common areas, lifts and the main power connection.
- Tenant pays: everything inside, from air conditioning and ceilings to furniture and IT, plus design fees and any approval fees for the fit-out drawings.
- Rent: the lowest rent per sq ft of the four stages, often with a rent-free period for the fit-out. Ikigai Law's 2020 guide said one to three months was typical for office tenants.
Warm shell
- Owner pays: the bare shell plus air conditioning, lighting, flooring and the basic services in your area.
- Tenant pays: the layout, furniture, cabling and anything specific to the business.
- Rent: higher than bare shell, because the owner has spent more. Ask how the difference was worked out.
Fitted and plug and play
- Owner or operator pays: the interiors, sometimes the furniture too.
- Tenant pays: a higher monthly rent or seat fee, usually with a longer lock-in so the investment can be recovered. Some owners recover fit-out through a separate fit-out rental over a fixed period. Ask what happens to that charge if you leave early.
Two costs people forget: the handback at the end of the lease, when the tenant may have to remove its interiors and restore the space, and the ownership of interiors, which should be written down. If the tenant paid for air conditioning units or furniture, does it take them, sell them to the owner, or leave them?
What fit-out costs: published benchmarks
Cushman & Wakefield's Asia Pacific Office Fit Out Cost Guide 2026, based on December 2025 prices, gives average fit-out costs per sq ft for Indian cities. Its figures cover furniture, mechanical and electrical works, builder works and audio visual or IT.
| City | Basic | Collaborative | Advanced | Reinstatement (average) |
|---|---|---|---|---|
| Mumbai | US$42 | US$73 | US$144 | US$10 |
| Delhi | US$37 | US$69 | US$135 | US$9 |
| Bengaluru | US$37 | US$67 | US$131 | US$9 |
| Hyderabad | US$35 | US$65 | US$129 | US$9 |
| Pune | US$35 | US$65 | US$129 | US$9 |
| Chennai | US$35 | US$65 | US$125 | US$8 |
In the guide, "basic" means limited meeting rooms (under a tenth of the space), simple finishes and few changes to ceilings or air conditioning. "Collaborative" adds more meeting rooms, break-out areas and better finishes. Reinstatement is the cost of restoring a space at handback.
How the stage changes your bill: in a bare shell, the tenant pays for air conditioning, ceilings, lighting and flooring on top of the interiors. In a warm shell, much of that is already in place, so the tenant's spend shrinks to the layout, furniture and IT. Ask the owner exactly which items in this kind of budget the shell already covers before you compare rents.
Convert dollar figures at the day's rate, and get at least two contractor quotes on your actual drawings. To see how fit-out changes the cost of leasing against coworking, use our office cost calculator.
Time to move in
The further from plug and play you start, the longer it takes. Example timeline, assuming a mid-sized office of a few thousand sq ft in a ready, approved building, with a decision maker available each week:
| Stage | Bare shell | Warm shell | Plug and play |
|---|---|---|---|
| Design and layout sign-off | 3 to 4 weeks | 2 to 3 weeks | None or a few days |
| Owner approval of drawings | 1 to 2 weeks | 1 to 2 weeks | None |
| Building works and services | 8 to 12 weeks | 4 to 6 weeks | None |
| Furniture, IT, snag list | 2 to 3 weeks | 2 to 3 weeks | A few days |
| Rough total | 3 to 5 months | 2 to 3 months | Days to two weeks |
These are illustrative, not promises. Long-lead items such as air conditioning plant, generator upgrades and imported furniture can add weeks. For comparison, the operator Smartworks says in its offer document that it can deliver workspace to clients within 45 to 60 days of a contract being signed, because it pre-builds its campuses.
Tie the start of rent and the lock-in to the actual handover date, not the signing date.
How coworking operators prefer to take buildings
For building owners, this is the part that matters most. Coworking and managed office operators usually want space early in the chain, so they can build their own layout, and they structure deals to recover what they spend.
- Large bare shell buildings on long leases. Smartworks says in its offer document that it typically leases entire or large bare shell properties from landlords, on long-term agreements of 10 to 15 years, with a lock-in of up to five years and a rent-free period of six to 12 months. Smartworks pays for the fit-out itself.
- Owner-funded interiors with a revenue share. Awfis's chairman told Outlook Business in November 2024 that under its managed aggregation model the landlord provides most of the capital for the fit-out, and revenue is shared, typically 65/35 or 70/30, after a minimum guarantee period. He said Awfis targets smaller commercial spaces of about 25,000 to 30,000 sq ft.
What this means if you own a building:
- Do not spend on interiors before you sign. An operator will design its own layout and may rip out cabins or ceilings you built.
- Get the warm shell basics right. Working lifts, enough washrooms, power capacity and generator backup, fire systems, a clean facade and a reliable water supply matter more than finishes.
- Have the paperwork ready. Operators will ask for the occupancy certificate, title documents and fire NOC early. In Karnataka, for example, a 2023 amendment to the Karnataka Fire Force Act requires a fire NOC to construct a high-rise building, defined as 21 metres or more.
- Decide who funds the fit-out. If the operator funds it, expect a rent-free period and a long lock-in. If you fund it, expect a share of revenue rather than a fixed rent.
Our guide on leasing your building to coworking operators compares fixed rent, revenue share and management deals in detail.
Grade A buildings and what "warm shell" means there
In Indian market reports, Grade A usually refers to newer office buildings with large, regular floor plates, central air conditioning, full power backup, good parking and professional facility management. A Grade A label does not tell you the handover stage, so ask whether the space is offered in bare or warm shell, and get the specification sheet.
In older or smaller buildings, the quality of base services varies more. Check the electrical load available per sq ft, the generator capacity and the floor-to-ceiling height before you agree a rent, because these limit what any fit-out can achieve.
For tenants: which stage should you take?
| Your situation | Usually the better fit | Why |
|---|---|---|
| Small team, or unsure of growth | Coworking or plug and play | No fit-out spend and a short commitment |
| Need to move in within a month | Plug and play or managed | Nothing to build |
| Growing team, standard office layout, 3 to 5 year horizon | Warm shell or a managed office | Faster and cheaper to fit out than bare shell |
| Special needs: labs, heavy equipment, data rooms, high power load | Bare shell or built to suit | You control every service from scratch |
| Large, stable team staying 9 years or more | Bare or warm shell lease | Fit-out cost spreads over a long stay |
| Want your own floor but no project work | Managed office | The operator builds and runs it for a monthly fee |
These are rules of thumb. Compare the full cost over the years you expect to stay, as our guide on coworking vs a traditional office lease shows, and read our guide to managed office space in India if you want a private floor without running the project.
Shell specification checklist for owners and tenants
Attach a filled-in version of this list to the term sheet. It prevents most disputes at handover.
- Handover stage named in writing: bare shell, warm shell, fitted or plug and play
- Floor finish: bare concrete, screed, tiles or raised floor
- Air conditioning: type, capacity, operating hours, and who pays for running it after hours
- Electrical load available to the premises, and the location of the distribution board
- Generator backup: what share of your load it covers, and the per unit charge
- Fire detection, sprinklers and extinguishers: what exists and who extends them to your layout
- False ceiling and lighting: included or not, and the specification
- Washrooms: common or in-premises, number of fixtures, plumbing points for a pantry
- Floor-to-ceiling height and any beams or columns that limit layout
- Occupancy certificate and current fire NOC, with copies
- Fit-out period, rent-free months and the date rent starts
- Who owns interiors and services paid for by the tenant
- Handback condition: remove everything, leave as is, or agreed reinstatement cost
- Owner approval process and timelines for fit-out drawings
- Working hours and rules for noisy fit-out work in an occupied building
How CoworkAtlas can help building owners
CoworkAtlas is an independent directory of coworking spaces, not owned by any operator. Searching is free for everyone, and the city pages from coworking in India show which operators already run centres near your building.
- Send us a building brief using the form on this page: location, area per floor, handover stage, power and parking. Building owners' briefs are shared with operators only after the owner agrees.
- Thinking of running a centre yourself? Read how to start a coworking space in India, and test the numbers with our coworking break-even calculator.
- Once a centre opens in your building, it can be listed free through list your space. A person checks every new listing before it goes live.
Questions people ask
What is the difference between bare shell and warm shell office space?
A bare shell has the building, lifts and power supply but nothing inside the premises. A warm shell adds basics such as air conditioning, lighting and finished flooring, so the tenant only builds the layout, furniture and IT.
What does warm shell mean?
Warm shell means the owner hands over the space with the main services installed, usually air conditioning, lighting, flooring and basic electrical work. The tenant still adds partitions, workstations and cabling.
What is a bare shell office?
It is a completed and approved building with an empty floor: structure, facade, lifts, common areas and a power supply, but no air conditioning, ceiling, lighting or finished flooring inside the premises.
What is a plug and play office?
A plug and play office is fully fitted and furnished, often with internet ready, so a team can start work within days. It usually costs more per month and may carry a longer lock-in.
Who pays for fit-out in a warm shell office?
Usually the tenant pays for the layout, furniture and IT, while the owner has already paid for the basic services. This is negotiable, and some owners fund fit-out in return for higher rent or a fit-out rental.
How much does office fit-out cost in India?
Cushman & Wakefield's 2026 guide put average fit-out in Indian cities at about US$35 to US$42 per sq ft for a basic specification and US$65 to US$73 for a collaborative one, including furniture and IT.
How long does it take to fit out a bare shell office?
Often a few months, covering design, owner approvals, building services, furniture and IT. A warm shell is quicker because the main services are already in place.
Do coworking operators prefer bare shell or warm shell buildings?
Many prefer to take space early and build their own layout. Smartworks says it typically leases large bare shell properties, while Awfis runs a model where the owner funds most of the fit-out and shares revenue.
What is a built to suit office?
A built to suit office is designed and built by the owner to one tenant's requirements, usually in return for a long lease.
Is warm shell rent higher than bare shell rent?
Usually yes, because the owner has spent more on services. Compare the rent difference with the fit-out you would otherwise pay for yourself.
Sources
- Brigade Group: Bare shell vs warm shell, which office space is right for you (February 2025, updated June 2026)
- Address Advisors: What are bare shell or warm shell office spaces
- Legal 500 / Ikigai Law: Negotiating a commercial office lease (June 2020)
- Cushman & Wakefield: Office Fit Out Cost Guide Asia Pacific 2026, India costs and reinstatement (pages 24 to 25)
- Cushman & Wakefield: Office Fit Out Cost Guide Asia Pacific 2026, fit-out classification (pages 12 to 13)
- Cushman & Wakefield: Office Fit Out Cost Guide Asia Pacific 2026, scope and pricing date (pages 2 to 3)
- IIFL: Smartworks Coworking Spaces Ltd, management discussion from its offer document
- Outlook Business: Awfis' Amit Ramani bullish on Tier II cities (13 November 2024)
- PRS India: Karnataka Fire Force (Amendment) Ordinance, 2023 (NOC for high-rise buildings of 21 metres or more)
General information, not legal, tax or financial advice. Rules and practice differ by state and change over time; check with your CA or lawyer.